TitleProduct

Aluminium Formwork for Standard Construction

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2021-07-17 14:45

  • Browse the number:

    76

Send an inquiries

Company Profile

Foshan Perfect Resource Building Metal Co., Ltd

By certification [File Integrity]

Contact:perfect(Mr.)  

Email:

Telephone:

Phone:

Area:Guangdong

Address:Guangdong

Website:http://www.nkperfectresource.com/ http://perfect.hfyt168.com/

Product Details

It is the main component for forming wall structures and column structures. The outer wall panel and the outer column panel are connected with kicker panel. Then, the inner wall panel and the inner column panel are connected with wall footing panel.


Advantages:

1.Short construction period: this product is a quick-release formwork system. A set can reach one floor in four or five days during normal construction, which greatly saves the management cost of the contractor (the current project under construction in Macau-TN27 public housing construction can reach One floor for three days).

2. Many times of repeated use, low average use cost: useing integrally extruded aluminum alloy profile as raw material (6063-T6 or 6061-T6), a set of template specification construction can be flipped and used 300-500 times Above, the average use cost is low.


Series Model: 6061-T6 (GB5237-2008 Standard)

Sheet Thickness:4mm

Surface Treatment: Hot light body

Width: 400/ 350/ 300/ 250/ 200/ 150/ 100mm

Length: 100mm~3000mm

Height: 65mm

Rail Width: 8mm

Trade Terms: EXW, FOB, CNF, CIF

http://www.nkperfectresource.com/